Municipal Affairs and Environment

Registration 1588

Black River ATV Trail

Proponent: Baxter Rodway

Summary of Environmental Assessment Process

Project Description:

The project involves the construction of a 2.5 kilometre ATV trail that will be used to access cabins located along the trail and at Fall Pond. The trail is proposed to be constructed along Old Mill Road near the intersection with Route 210 and near the community of Swift Current. Construction is to be completed by manual labour and use of an excavator. The trail will connect with an existing ATV trail and provide an alternate access point along Old Mill Road. The existing trail is currently accessed along Route 210. Construction of the trail is expected to begin in summer 2011.

  • June 16, 2011 - The undertaking was registered.
  • July 25, 2011 - Public comments are due.
  • July 28, 2011 - The Minister's decision is due.
  • September 6, 2011 - The Minister announced that the project is released.

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free opens new window

 
Last Updated:
This page and all contents are copyright, Government of Newfoundland and Labrador, all rights reserved.