Municipal Affairs and Environment

Walking Trail (Northeast Arm, Placentia)

Registration 977

Proponent: East Coast Trails

Summary of Environmental Assessment Process

  • The proponent proposes to construct a walking trail along Northeast Arm near Placentia. The trail would be approximately 1.0 metre wide and 10.4 kilometres long. This proposed trail would be a part of the D’IBERVILLE trail system from Ferryland to Placentia. Trail construction is proposed to start in August 2002 with work continuing over the next few years. The trail would, for the most part, proceed through a wilderness setting with the addition of boardwalks, stairs and bridges where necessary.
  • October 18, 2001 - The undertaking was registered.
  • December 5, 2001 - The Minister announced that the undertaking was released from environmental assessment.

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free opens new window

 
Last Updated:
This page and all contents are copyright, Government of Newfoundland and Labrador, all rights reserved.