Mount Pearl Drilling Liquid Mud Plant

Proponent: Halliburton Group Canada

Summary of Environmental Assessment Process

Project Description:

The proponent has submitted a proposal to develop a temporary liquid mud plant at 30 Kyle Avenue, Mount Pearl in Donovan’s Industrial Park. The plant would be located on Pardy’s Waste Management and Industrial Services site and would provide drilling mud to the offshore oil and gas industry. The site will be used for the blending/mixing and storage of drilling fluids (mud). The plant will occupy a 465 square metre area with a capacity of 630 cubic metres per batch of drill mud. On site warehouse storage space and existing storage tanks will be used to store base fluids and blended drill mud.

The undertaking was registered on May 12, 2017; the deadline for public comments is June 19, 2017; and the minister’s decision is due by June 26, 2017.

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free opens new window

 
Last Updated:
This page and all contents are copyright, Government of Newfoundland and Labrador, all rights reserved.