North Atlantic Refinery Storage Tank Expansion

Proponent: North Atlantic Refining Limited

Summary of Environmental Assessment Process

  • Project Description:The proponent proposes to construct and operate a new 2,384,700 litre (15,000 bbl) gasoline storage tank, and associated infrastructure, at their refinery in Come-by-Chance.The new tank is required as part of the Truck Loading Terminal project but will be constructed separately adjacent to the existing NARL tank farm on "Gasoline Hill" inside a new earthen containment dyke. Construction is planned to begin on April 1, 2006 with the tank being commissioned on September 10, 2006.
  • December 28, 2005 - The undertaking was registered.
  • February 9, 2006 - Public comments are due.
  • February 23, 2006 - The Minister releases the project from further environmental assessment.

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free opens new window

Last Updated:
This page and all contents are copyright, Government of Newfoundland and Labrador, all rights reserved.